The Army had hired a firm to turn the explosives into harmless waste, but then dropped it in favor of a controlled blast that could launch lead dust across Iowa.

The Army awarded a contract to MuniRem Environmental, a Georgia-based firm that uses chemicals to neutralize munitions. But it canceled the deal two months later, citing safety concerns, opting to blow up nearly five tons of the material instead.

The Army did not respond to questions about its canceled deal with MuniRem and why it chose to blow up the dangerous material. The details about the MuniRem contract have not previously been reported.

Mr. Nzengung of MuniRem said the company has filed public records requests seeking more information on why its technology was dismissed, and has not received a response.

  • HubertManne@piefed.social
    link
    fedilink
    English
    arrow-up
    9
    ·
    17 hours ago

    To me the main thing is the problem is do to age and why did they wait for it to get this bad. Also apparently its more unstable in cold they are saying but heating an environement is not hard to do and the army is experts at making quick temporary structures. The whole thing smells to high heaven.

    • peopleproblems@lemmy.world
      link
      fedilink
      arrow-up
      6
      ·
      6 hours ago

      It was just discovered. There was a company that was supposed to handling it, but they were apparently pocketing the money and not actually managing it.

      • HubertManne@piefed.social
        link
        fedilink
        English
        arrow-up
        1
        ·
        4 hours ago

        this just leads to the next phase of incomepetence. Why are dangerous materials not tracked. They hired a company and then put up a mission accomplished banner or what. Our military is supposed to be big on paperwork and inventory and supply chain management type thing. At least previously the military was supposedly competent around those things. Its what made it such a powerful entity in battle supposedly again. It feels like somethings changes. Like competency was replaced with patronage and cronyism.

        • peopleproblems@lemmy.world
          link
          fedilink
          arrow-up
          1
          ·
          49 minutes ago

          So that’s the fun part. In 2004, the DoD was notified of the concerns of the (then 40+ years old) stockpile, and an analysis was done on it and it was noted to be deteriorating. The company contracted to it (“American Ordinance LLC” a subsidiary of Day & Zimmermann) basically forged the paperwork that it was “stored in a stabilized form.” Obviously it wasn’t.

          Then MuniRem was brought in circa 2025 to chemically neutralize it, they took one look at it and said “fuck that, you’ll kill us all.”

          Day & Zimmermann probably won’t see penalties since its a subsidiary or some shit

          • HubertManne@piefed.social
            link
            fedilink
            English
            arrow-up
            2
            ·
            40 minutes ago

            this is starting to make sense. so it was being inventoried but the soldiers doing it did not realize it was not stabilized properly and just noted it was still there. Still seems wierd its less stable at low temperatures. Im assuming a phase change kind of thing or seperation or such.